From the moment a project starts, prior to project acceptance, our team follows strict procedures. It begins with confirming your requirements and specifications. In some cases, develop them. The team is then brought together to define the scope of work, research every aspect of your specific requirement and make recommendations.

As the project moves forward, our documented system guides every step from design and development planning to control of engineering changes. It is this systematic attention to every detail that ensures all customer specifications and applicable statutory codes and regulatory requirements are met.

 


 

Planning

Inputs & Outputs

Review

Verification

Control of Design & Development Changes

 


  



Contact Us  |  Site Map  |  Terms & Conditions  |  Privacy Policy  |  MECO.com  |  Employment  |


12505 Reed Road, Suite 100, Sugar Land, TX 77478
281.276.7600 (p) 800.421.1798 | 281.313.0643 (f)

© 2004 MECO, All Rights Reserved. This website requires Flash. Click Here if you don't have Flash.