|
|

Engineering identifies, documents and reviews for adequacy all design inputs and outputs. All design output is approved by Engineering.
Sources for design input include military client and end user specifications & standards, contractual requirements, applicable statutory and regulatory requirements, design review minutes, and any other applicable documents.
Output data is generated throughout the life of the project, from initiation through client acceptance. This data documents the final configuration of the end item. Our process for ensuring that design output meets all requirements includes:
- Ensuring that design input is defined by the military client and end user.
- Ensure delivery to the client of any design output certifications/documentation that are required.
- Ensuring design input criteria are feasible and acceptable.
- Resolve with the client any ambiguous or conflicting design requirements.
- Provide all initial, and any changed design input, to all affected functional groups.
- Ensure compliance to defined client requirements throughout the life of the project.
- Initiate Engineering Change Orders for any changes to originally defined design input and maintain documented evidence of all such changes.
|